This is what it looks like in practice.

Four projects by our sister company — in logistics, manufacturing, commercial property and open land, each with starting position, solution, financing model and benefit. Anonymised: the sector, the scale and the result are here, the names of the businesses are not.

  • 4 project examples
  • By our sister company
  • Anonymised

Three sites on one grid line · schematic

PB-01

Contract logistics and distribution centre

Anonymised project selection · Contract logistics and warehousing

Logistics centre with 45,000 m² of roof area, a growing electric fleet and a limited grid connection.

Solution
  • 2.1 MWp of solar
  • 1.5 MWh of battery storage
  • 24 DC fast charging points with dynamic load management
  • Energy management on site and control at the grid connection point
Financing
  • On-site PPA through a finance partner, with no investment by the site operator.
What it delivers
  • The fleet charges without the grid connection having to be extended, and the power price is fixed for the long term.
  • 2,100 MWh Annual yield
  • 756 t CO₂ avoided
  • 412,000 € Calculated annual value

Calculated, not measured: 1,000 kWh per kWp and year (open land 1,050), CO₂ at 0.36 kg per kWh from the German grid mix, the value at 25 ct per kWh of self-consumption and 7 ct per kWh of feed-in. The annual value is the value of the electricity generated before operating and financing costs — not a promised saving.

Related Solutions and systems Financing and models

Logistics centre with rooftop solar

Abb. 01 Logistics centre with rooftop solar

Have a comparable site checked

PB-02

Precision manufacturing and machining

Anonymised project selection · Metalworking

A metalworking production site with high peak loads and sensitive machinery.

Solution
  • 980 kWp rooftop array
  • 800 kWh battery for peak shaving
  • Integrated harmonic filters
Financing
  • Contracting through a finance partner.
What it delivers
  • A lower annual peak and therefore a lower demand charge, plus better protection of the machinery against grid disturbances.
  • 980 MWh Annual yield
  • 353 t CO₂ avoided
  • 192,000 € Calculated annual value

Calculated, not measured: 1,000 kWh per kWp and year (open land 1,050), CO₂ at 0.36 kg per kWh from the German grid mix, the value at 25 ct per kWh of self-consumption and 7 ct per kWh of feed-in. The annual value is the value of the electricity generated before operating and financing costs — not a promised saving.

Related Solutions and systems Financing and models

Hall roof with solar

Abb. 02 Hall roof with solar

Have a comparable site checked

PB-03

Business park with several tenants

Anonymised project selection · Commercial property, multiple units

A let business park with many units and meters of their own.

Solution
  • 2.8 MWp of solar across several hall roofs
  • A central battery with 1.76 MWh
  • All tenant meters pooled, with automated tenant billing
Financing
  • Hire purchase through a finance partner.
What it delivers
  • Low-cost power for the tenants, a more attractive site for the owner and no billing effort.
  • 2,800 MWh Annual yield
  • 1,008 t CO₂ avoided
  • 549,000 € Calculated annual value

Calculated, not measured: 1,000 kWh per kWp and year (open land 1,050), CO₂ at 0.36 kg per kWh from the German grid mix, the value at 25 ct per kWh of self-consumption and 7 ct per kWh of feed-in. The annual value is the value of the electricity generated before operating and financing costs — not a promised saving.

Related Solutions and systems Financing and models

Commercial site with several buildings and solar

Abb. 03 Commercial site with several buildings and solar

Have a comparable site checked

PB-04

Ground-mounted array with large-scale storage

Anonymised project selection · Open land, feed-in and trading

Open land away from the load, connected at high voltage, with revenue from feed-in and trading rather than from self-consumption.

Solution
  • 50 MWp of ground-mounted solar
  • 40 MWh of large-scale storage
  • Dedicated grid connection point with its own substation
  • Trading through our own software: energy management and virtual power plant
Financing
  • Project finance through a finance partner.
What it delivers
  • The battery shifts feed-in out of the midday peak into the expensive hours — the site delivers power not only in volume but at the time it is needed.
  • 52,500 MWh Annual yield
  • 18,900 t CO₂ avoided
  • 3,675,000 € Calculated annual value

Calculated, not measured: 1,000 kWh per kWp and year (open land 1,050), CO₂ at 0.36 kg per kWh from the German grid mix, the value at 25 ct per kWh of self-consumption and 7 ct per kWh of feed-in. The annual value is the value of the electricity generated before operating and financing costs — not a promised saving.

Related Solutions and systems Financing and models

Ground-mounted array in rows

Abb. 04 Ground-mounted array in rows

Have a comparable site checked

Sister company

Further projects by our sister company.

Completed for these companies, among others. We name the companies, not the projects: site, load data and contract model stay with the client.

Extract · alphabetical 61 companies

  • Airbus
  • ALDI Süd
  • ALDI Südwest
  • Allgaier Gruppe
  • Allgaier Spedition GmbH & Co. KG
  • ALSCO Berufsbekleidung
  • Amazon Logistik
  • Andreas Schmid Logistik AG
  • Aptar Group
  • ASSMANN
  • AUDI AG
  • BASF AG
  • Bayer AG
  • Benteler AG
  • Betonbau GmbH & Co. KG
  • Bilfinger Berger
  • BMW AG
  • BNP Paribas FM
  • Bremer Bau
  • Continental AG
  • CorpusSireo Fonds
  • Dachser GmbH & Co. KG
  • Daimler AG
  • Deutsche Bahn
  • Deutsche Fonds Holding
  • Deutsche Post DHL
  • Deutsche Telekom
  • DLR
  • DWS Köln
  • Ed. Züblin
  • EnBW AG
  • EvoBus AG
  • Fiat-Chrysler
  • Fraunhofer Institut
  • Fürstenhof – Commerzbank Frankfurt
  • Goldbeck
  • HeidelbergCement
  • Heinrich Schmid
  • Hellmann Logistik
  • Honold – Continental
  • ISS Communication Services GmbH
  • Judo Wasseraufbereitung
  • Juwi Zentrale
  • Kühne + Nagel
  • LBBW Immobilien
  • Marelli Automotive Lighting
  • Michelin AG
  • Phoenix Investment
  • Porsche AG
  • REWE
  • Rhein Energie
  • SAME Deutz-Fahr Deutschland
  • Sandvik Tooling
  • STRABAG Property and Facility Services GmbH
  • T-Systems
  • Terex Deutschland GmbH
  • Thyssen-Krupp
  • Vodafone
  • Voest Alpine
  • Volkswagen AG
  • Zeppelin AG

Further projects are covered by confidentiality agreements and are not listed here.

Your site

What is possible at your site is clear after thirty minutes.

Every one of these projects began with the same step: a look at the load profile, the area and the grid connection. Without obligation and free of charge.

Request a site check