Skip to content

Financing and models

Realise energy projects without tying up your investment budget.

We bring the right financing with us, through our finance partner. You secure low, predictable energy costs and keep your funds for your core business.

  • Six models
  • Through our finance partner
  • Or as a direct investment

Yield over year and time of day as a surface · schematic

How it works

You provide the site. We bring the energy infrastructure and the capital.

Many commercial and industrial businesses hesitate over large solar and storage projects because investment budgets are tight or approvals take a long time. As a rule, that hurdle disappears: our finance partners carry the investment, and depending on the model you invest nothing yourself.

  • 01

    As a rule, no equity

    Depending on the model, solar, storage and charging infrastructure are financed entirely through our finance partners.

  • 02

    Low-cost power from your own roof

    You buy the power generated on site at a contractually fixed, durably stable price.

  • 03

    No operating risk

    Maintenance, monitoring, servicing and insurance stay with us.

  • 04

    Easy on the balance sheet

    As a rule, the project ties up no credit lines with your bank — depending on the model and the accounting.

This is how the roles are shared: GFG Energy plans the project and manages delivery through to commissioning. In the financing models, our finance partner funds the installation, holds the investment and operates it.

Which structure is possible in a given case depends on the project. We calculate variants, not promises — the six models below show what is being talked about.

Principle

We calculate variants. We promise no return.

What an energy project delivers depends on figures that come from your company: consumption, price components, investment objectives, tax position. We put those figures into a transparent calculation and show how sensitive the result is to each single assumption.

  • 01

    An open calculation

    Every assumption is named and can be changed; no black box.

  • 02

    Several variants

    Technical and structural, calculated side by side.

  • 03

    Including the no

    If a variant does not pay off, that is part of the result.

Models

Six ways to carry a project.

  1. 01

    Contracting

    Our finance partner funds the installation, holds the investment and operates it. GFG Energy plans and manages delivery, and you buy the power directly on site.

    Your benefit
    As a rule, no investment of your own.
    Worth knowing
    The contracts run for many years. Term and price formula deserve a close reading.
  2. 02

    On-site PPA

    A long-term power purchase agreement at an agreed fixed price from the installation on your own site.

    Your benefit
    Price stability over 10 to 20 years.
    Worth knowing
    The installation stands on your site. Area, structure and access are part of the contract.
  3. 03

    cPPA and vPPA

    Green power from installations away from your site: physically delivered (cPPA) or as a financial hedge with guarantees of origin (vPPA).

    Your benefit
    Predictable power prices and green power even without land of your own.
    Worth knowing
    With a vPPA no power flows, only a price settlement. The accounting treatment belongs settled beforehand.
  4. 04

    Leasing and hire purchase

    Use of the equipment against fixed monthly instalments; with hire purchase, ownership transfers at the end.

    Your benefit
    Calculable instalments, your liquidity stays free.
    Worth knowing
    The instalment affects your balance sheet and your tax position. That is for your tax adviser to settle, not for us.
  5. 05

    Tolling

    The capacity of a large battery is made available to a marketer for a fixed fee.

    Your benefit
    Predictable earnings, independent of how the market moves.
    Worth knowing
    The fee is fixed, the market revenue is not. Whoever markets it themselves carries both the chance and the risk.
  6. 06

    Direct investment

    You invest yourself. GFG Energy takes on planning, delivery and system integration.

    Your benefit
    Full ownership, and the returns stay entirely with you. Tax benefits such as the German investment deduction (IAB) and special depreciation are possible.
    Worth knowing
    It ties up capital and requires a decision on operation and maintenance.

§ 7g EStG

Using tax benefits with a direct investment

If you invest yourself, the acquisition can often be brought forward for tax purposes. Under German law, small and medium-sized businesses can, under certain conditions, form an investment deduction (Investitionsabzugsbetrag, IAB) even before the purchase and use additional special depreciation after commissioning. That lowers the tax burden in the early years and improves liquidity exactly when the investment falls due.

We supply you with reliable investment figures and schedules early on. Whether and to what extent these rules apply to your company is for your tax adviser to determine.

This is not tax advice: we calculate and prepare, only your tax adviser may assess and advise. The note applies to direct investment only — with contracting, PPA, leasing and tolling it is our finance partner who invests.

Which model fits depends on site, consumption and your accounting. That is what the site check settles: we calculate the variants that come into question for your company and set them side by side.

More Settle it in the first conversation The building block in brief

Attitude

A well-founded no is worth more than a beautiful calculation.

Knowing before the investment that something does not carry itself has saved money.

Basis of calculation

What goes into the business case.

These quantities determine the result. Each of them comes from a source that is named — nothing is estimated as long as the source is missing.

Input quantities · extract 8 inputs
Quantity Where it comes from Effect
01Annual consumption Billing, load profile Basis for the size of the installation
02Peak load Load profile, quarter-hourly values Demand charge, battery sizing
03Energy and demand price Supply contract The value of every kilowatt hour saved
04Self-consumption share Simulation from load profile and generation The largest lever in the calculation
05Feed-in tariff or PPA Statutory rules, contract offer The value of the surplus
06Capital cost Offers from the specialist firms Basis of the payback
07Operating cost Maintenance contracts, insurance, monitoring The ongoing burden
08Tax effect Your company's tax adviser Shifts the result, not the engineering

Frequent questions

What people usually ask about financing.

01 Do you arrange the financing?

We prepare the documents so that banks, funds or investors can work with them, and we accompany the conversations. The financing itself you conclude with your partner.

02 Do you include subsidies in the calculation?

We check which programmes are in principle open to your project and calculate variants with and without them. Commitments come from the funding body, not from us.

03 What does the business case cost?

That depends on the scope — one site with an existing load profile is something other than five sites without data. You get an offer before anything is calculated.

04 Can we keep the calculation up to date ourselves afterwards?

Yes. The analysis is handed over so that assumptions are visible and can be changed. If the power price moves, the result moves with it, traceably.

Site check

What is possible at your site?

In a thirty-minute first conversation you get an initial assessment of which combination of solar, battery storage and charging infrastructure could relieve your site. Checking and calculating come afterwards — with your load profile and the grid operator's information.

  • Thirty minutes, no preparation, no obligation
  • Area and grid potential: what is technically possible
  • Financing options: how the project works without your budget

Helpful, but not required

  • Load profile or annual consumption
  • Roof drawings or an aerial photo
  • Your last electricity bill
  • Any plans for the site

If you have none of this, that is no obstacle. The load profile can be requested from your metering operator — we tell you how in the conversation.